Our Facilities and Equipment
· PT.SHINWON CHEMICAL PRODUCTS INDONESIA
Facility |
Total |
Capacity |
Materials Warehouse |
1,250 M2 |
250,000 Prs/Month |
Cutting line |
83 Unit |
375,000 Prs/Month |
Skiving line |
15 Unit |
48,750 Prs/Month |
Sewing line |
25 Line |
240,000 Prs/Month |
Ströbel line |
18 Unit |
110,000 Prs/Month |
Stockfit line |
4 Line |
275,000 Prs/Month |
Assembling line |
4 Line |
240,000 Prs/Month |
· PT. SAMBU SHINWON INDONESIA
Types of facilities |
Number |
Functions |
Capa (per 1 shift) |
Auto Cutting (Die Cut Insole) |
5 |
Automatic Cutting Material |
2,000,000 Prs/Month/Shift |
Manual Cutting (Molded Insole) |
9 |
Manual Cutting |
270,000 Prs/Month/Shift |
Auto Cutting Rotary (Molded Insole) |
14 |
Automatic Cutting Molded Insole with Thompson Knife |
1,120,000 Prs/Month/Shift |
Heat Press (Molded Insole) |
31 |
Automatic Electric Heat Press 12 molds per set |
1,339,000 Prs/Month/Shift |
Transfer Logo |
18 |
Transfering Logo 2 press per set |
1,296,000 Prs/Month/Shift |
Buffing (Die Cut Insole) |
18 |
Die-Cut Insole Arch Buffing |
540,000 Prs/Month/Shift |
Laminating |
2 |
Electric Heating Water based & Solvent based glue laminating |
33,600 Mtr/Month/Shift |